Anglo American’s Australian Coal division engaged Dowdens Pumping & Water Treatment [Mackay] to deliver eight specialised underground pumping PODs used for various dewatering applications at their Grosvenor Coal Mine, located 190km southwest of Mackay in Moranbah, Central Queensland.
The Grosvenor mine is a developing underground longwall operation that makes up part of Anglo American’s plan to triple hard coking coal production at their Moranbah mine sites. Located next to their existing Moranbah North coal mine, Grosvenor is set to produce up to 5 million tonnes of hard coking coal per annum for export. The Grosvenor mine utilises a 10km overland conveyor to transport high-quality metallurgical coal to the Moranbah North Coal Handling & Preparation Plant.
Construction on Anglo American’s $1.95 billion Grosvenor longwall project began back in January 2013, with the development celebrating a number of industry firsts, including being the first underground coal mine in Queensland to use a tunnel boring machine to develop the drifts, or access tunnels, in coal mine development. Anglo American aimed to have the Grosvenor mine raise the bar for onsite system and production efficiency – making the supply of unique underground POD pumping systems a perfect match for Dowdens Pumping & Water Treatment’s experienced Engineering Department.
Underground Pumping PODs are used in mines as part of the site water management process. Mining water collected from sumps, and wet areas by Wilden air operated diaphragm pumps (AODP) and delivered to PODs where water level sensors then activate the pump and transfer the collected mine water to a mains pump station, underground storage dam or directly out of the mine portal.
Mining water is typically dirty with coal fine, rocks and dirt; therefore, slurry pumps are required to handle such water. PODs can be located in hazardous areas and can be fitted with Flameproof motors and motor controllers with PLC (Programmable Logic Controllers) and SCADA (Supervisory Control and Data Acquisition).
Dowdens Engineering Department’s comprehensive abilities have been on the radar of many Central Queensland/Bowen Basin mines for some time through direct contact and working with industry-leading consulting engineering firms. Dowdens ability to expertly design/manufacture/install, and commission unique equipment built to specific client needs, together with a history of successful installations over the past 15 years in the Bowen Basin, has positioned the business as Queensland’s premier pumping & water treatment organisation.
The Grosvenor mine site requirements meant each POD needed to have a 200kW power rating. The site’s physical constraints (i.e. the underground mined roof height and width and the site lifting equipment for transporting) meant careful consideration was required for the overhung load whilst transporting this equipment. The capacity of a standard Dowdens POD is 4m3 with a 110kW motor; however, the more significant flow rate required to and from the POD meant a 6m3 capacity working volume was needed. Bigger capacity and higher duty equated to a larger size motor and pump, more robust steel framework and additional accessibility for scheduled servicing.
Dowdens standard POD design incorporates a dirty water receiving area. This area, integral to the primary hopper (container for a collection of bulk material such as rock or soil), ensures particles that are too large for the pump to digest and transport are separated and manually removed periodically, ensuring trouble-free pumping.
Pumps selected by Dowdens for this harsh duty were Stalker SHD Underground Dewatering pumps with mechanical seals, seal lubrication and cooling. Motors selected were WEG brand Flameproof mine spec motors. The control for the pumps is a flameproof 200kW model with PLC and HMI (Human Machine Interface) screens. The controller starts and stops the pump whilst also monitoring for faults and relaying important information to the mine surface via SCADA. Dowdens PODs built for the Grosvenor mine can easily interchanging the motors/pumps for differing duties. These will be identified as 200kW and 132kW cassettes. The Main Control Unit (MCU) can operate at either 200kW or 132kW with only slight modifications to load controls to accommodate this change.
The larger size and the flexibility to change the duty, together with Dowdens strategic POD site placement advice, has enabled Anglo American less manoeuvring of the POD through development, saving costly underground labour and downtime. Without reliable pumping, the mine’s production slows/halts causing delays and safety issues which cost the mine many thousands of dollars each day. It was imperative the system worked and was highly reliable. This project was delivered on time and within budget. Key project system components are listed below:
Dowdens Pumping & Water Treatment design philosophy for this project was:
Dowdens Pumping and Water Treatment offers a wide range of high-quality products from globally recognised brands, ensuring customers access reliable and efficient solutions. We are also authorised service agents for all the brands we supply.
Dowdenp provides comprehensive brochures in our Document Library, showcasing our extensive range of products and solutions for pumping and water treatment. These brochures showcase our capability to create custom solutions for any application and highlight our team of industry-trained professionals who can adapt to meet your specific needs.
The Dowdens Video Library features real-world examples of installations, showcasing our practical experience and problem-solving skills. Also included is a comprehensive range of brand videos showcasing various product uses and capabilities.
Dowdens Case Studies highlight our extensive expertise in providing innovative and practical solutions across various industries, including agriculture, mining, construction, and municipal services. These detailed insights demonstrate our ability to manage projects from initial planning and design through to final commissioning.
The Dowdens Team are ready to help. Contact us today for more information and to start the conversation.
Dowdens has four convenient locations throughout Queensland. We have branches in Mackay and Proserpine in the north, servicing the Sugar and Coal industries, a centrally located branch in Rockhampton, specialising in the Agricultural and Coal industries, and a branch in Brisbane, servicing multiple industries in the southeast of Queensland.