Water Treatment Plant for Spring Creek Seedlings

Customer: Spring Creek Seedlings

Location: Stanthorpe, QLD

Specifications & Features:

Dowdens Pumping and Water Treatment have designed and commissioned a new water treatment plant at Spring Creek Seedlings.

Daily Treated Water Production: 20m3

Design Philosophy:

  • Cost Effectiveness
  • Current Best Practices
  • Water Quality
  • Ease of Installation
  • Simple Operation
  • Reliability and Reduced Maintenance

Specifications & Features

Plant Install Description:

  • The plant produces 20m3/day of treated water from a combination of turbid dam and bore water, removing the turbidity through Ultra filtration (UF) separation process using membranes with pore sizes in the range of 0.01 micron
  • The UF system removes high molecular-weight substances, colloidal materials, and organic and inorganic polymeric molecules so very clean water can be delivered to a Reverse Osmosis (RO) system
  • Seedlings require water within an optimum conductivity range, and the raw water conductivity on site was too high for use - an RO system was used to remove conductivity then the water was blended back with the clean UF water to attain the desired conductivity range.


 