Media Library

Media Library & Case Studies

Design and Install Potable Water Treatment System

Customer: BMA Blackwater Mine

Completion Date: 13/07/2012

Location: Blackwater, QLD

Specifications & Features:

Plant Description: Dual VSD pumps to supply raw water to ultrafiltration system for turbidity removal. Carbon filtration to remove taste and odour. Potable water disinfection via chlorine dosing.

Daily Treated Water Production: 100KL

Key Features: Minimum operator requirements utilising PLC control with built-in HMI and Data Logging.


Water Use: Potable grade water to be used for the drinking, cooking, washing and showering requirements throughout the BMA Blackwater mine site.

Water Quality Requirements: Water quality to conform to NHRMC guidelines.

View Localbuy Current Contracts Registered with Rapid Contractor Management