Media Library

Media Library & Case Studies

Australia Pacific Liquified Natural Gas Project (APLNG)

Customer: Broad Construction Services

Completion Date: 8/10/2012

Location: Condabri, QLD

Specifications & Features:

Water Use: Potable grade water to be used for drinking, cooking, and washing requirements throughout the camp.

Daily Treated Water Production: 60kL

Water Quality Requirements: Water produced conforms with Australian NHRMC Guidelines for potable water.

Key Plant Features: A water treatment plant was supplied complete with ultra-filtration membrane technology utilising state of the art equipment followed by carbon filtration to produce potable water that meets Australian drinking water guidelines.

A robust construction was required for the arduous environment conditions. Off the shelf components to facilitate servicing and spare part replacements. Minimum operator requirements by utilising PLC control with built-in HMI and Data Logging.








Details:

Plant Description: Containerised, packaged, plug and play automatic high purity water treatment plant comprising of:

  • Disc filters for coarse filtration
  • Media filtration for turbidity reduction
  • Ultrafiltration (UF) for filtration to <0.2 micron
  • Turbidity analyser
  • Carbon filtration for taste, odour and organic removal
  • Monitored chlorine dosing for disinfection

Raw, backwash and treated water storage tanks included in scope of supply and installation.


 
View Localbuy Current Contracts Registered with Rapid Contractor Management